It is the first DC power transmission project in Turkey which was connected with local transformer substation in Turkey and integrated into Turkish power grid. The project has filled the gap in DC transmission technology in the Turkish electricity market and enhanced the reliability and security of Turkish power grid.
Location: Van, Turkey
Project Scope: Construction of a 600MW back-to-back converter station
Operation Date: November, 2022
Scope of Work Undertaken by XJ: Supply of convert valves, valve control system and valve cooling system